Lets say I have integrated 200 subs, the used drizzle integration, but I decide later to reject a few of the subs. Do I have to re-run integration, or can I just re-do the drizzle and omit the rejected subs.
I ask because I don’t know how reliant drizzle is on a previous run of integration. It’s just a time saver, especially if there are a few hundred subs to re-do.
Thanks,
Mike